|
|
marujo_sortudo
Hero Member
    
kARRR-ma: +11/-0
Offline
Posts: 136
|
 |
« Reply #1 on: November 09, 2011, 09:20:41 AM » |
|
Well this will have been two years now since I bought Mimi Rose. This winter hopefully I'll be getting ahead on maintenance and making the boat into a better "office," as I plan to live aboard and telecommute from the boat next year while traveling south down the ICW. Task list for the boat looks like: replace standing rigging, new mainsail, new paint for the half of the exterior surfaces I didn't paint last year, some interior touch up, install deck fitting for holding tank pump out, replace/lengthen primary anchor rode, regalvanize anchors, strip 20 years of bottom paint, repitch prop, replace cutless bearing, change out head gaskets, replace anchor light with LED system, replace most used interior lights with LEDs, troubleshoot glow plugs, replace mag valve on kerosene heater, replace some odd bits of running rigging, and some other stuff I'm probably not remembering right now. Making it a better office includes running a wifi system up the mast, installing an inverter, wiring up solar, etc. Should keep me busy while I dream/hope for a early launch date....
|
|
|
|
|
Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|